
About the project
The airport expanded Terminal 2 and added aircraft gates. Team members helped design and connect the technology for the new spaces.
What the team did
- Surveyed the site, supported design, and documented plans in CAD
- Designed system connections, wrote specifications, and planned the network
- Planned and managed systems integration
- Helped oversee construction, track progress, and manage vendors
